Al Gumruk is a 2 km² city in Alexandria, Arab Republic of Egypt with a population of 92,121.
The nearest HV substation is 0.5 km away. The nearest transmission grid line is 0.4 km away.
The nearest fiber route is on site. The nearest IXP is 217.4 km away. The nearest subsea landing station is 0.3 km away.
The city faces Wildfire as primary natural hazard risks. Coastal Flood, Tsunami are at moderate levels. Overall hazard score: 2.2/3.
Between 2020–2025, 0 conflict events were recorded (trend: stable). Most recent year (2025): 0 events. Stability score: 3.0/3.
Water stress is rated Extremely High (score 5.0/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 92,121. Data density score: 1.4/3.
Al Gumruk scores 46/100 overall (Grade D, Average). Investment profile: Early-Stage Market. Sub-scores: Disaster Risk: 15/25, Stability: 25/25, Water Risk: 0/25, Data Density: 5/25.