Zemam Out is a 3,451 km² city in Behera, Arab Republic of Egypt with a population of 101,906.
The nearest HV substation is on site. The nearest transmission grid line is 22.9 km away.
The nearest fiber route is on site. The nearest IXP is 78.8 km away. The nearest subsea landing station is 90.0 km away.
The city faces Wildfire as primary natural hazard risks. Extreme Heat are at moderate levels. Overall hazard score: 2.4/3.
Between 2020–2025, 0 conflict events were recorded (trend: stable). Most recent year (2025): 0 events. Stability score: 3.0/3.
Water stress is rated Extremely High (score 5.0/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 101,906. Data density score: 2.9/3.
Zemam Out scores 67/100 overall (Grade B, Top 35%). Investment profile: Strong Candidate. Sub-scores: Disaster Risk: 18/25, Stability: 25/25, Water Risk: 0/25, Data Density: 24/25.