Zemam Out is a 728 km² city in Shrkia, Arab Republic of Egypt with a population of 304,048.
The nearest HV substation is on site. The nearest transmission grid line is on site.
The nearest fiber route is on site. The nearest IXP is 20.0 km away. The nearest subsea landing station is 79.4 km away.
The city faces Extreme Heat, Wildfire as primary natural hazard risks. Overall hazard score: 2.2/3.
Between 2020–2025, 0 conflict events were recorded (trend: stable). Most recent year (2025): 0 events. Stability score: 3.0/3.
Water stress is rated Extremely High (score 5.0/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 304,048. Data density score: 1.4/3.
Zemam Out scores 46/100 overall (Grade D, Average). Investment profile: Early-Stage Market. Sub-scores: Disaster Risk: 15/25, Stability: 25/25, Water Risk: 0/25, Data Density: 5/25.