Nuweiba is a 5,585 km² city in South Sinai, Arab Republic of Egypt with a population of 8,232.
The nearest HV substation is on site. The nearest transmission grid line is on site.
The nearest fiber route is on site. The nearest IXP is 292.3 km away. The nearest subsea landing station is 5.6 km away.
The city faces Extreme Heat as primary natural hazard risks. Coastal Flood, Earthquake are at moderate levels. Overall hazard score: 2.3/3.
Between 2020–2025, 5 conflict events were recorded (trend: stable). Most recent year (2025): 1 events. Stability score: 1.5/3.
Water stress is rated Extremely High (score 4.9/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 8,232. Data density score: 2.9/3.
Nuweiba scores 48/100 overall (Grade D, Average). Investment profile: Early-Stage Market. Sub-scores: Disaster Risk: 17/25, Stability: 6/25, Water Risk: 0/25, Data Density: 24/25.