Komenda-Edina-Eguafo-Abirem Municipal is a 451 km² city in Central, Ghana with a population of 177,439.
The nearest HV substation is on site. The nearest transmission grid line is on site.
The nearest fiber route is on site. The nearest IXP is 135.4 km away. The nearest subsea landing station is 130.5 km away.
The city has no high-level natural hazard risks. River Flood, Urban Flood, Coastal Flood, Extreme Heat are at moderate levels. Overall hazard score: 2.0/3.
Between 2020–2025, 12 conflict events were recorded (trend: decreasing). Most recent year (2025): 1 events. Stability score: 2.2/3.
Water stress is rated Low (score 0.6/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 177,439. Data density score: 2.9/3.
Komenda-Edina-Eguafo-Abirem Municipal scores 75/100 overall (Grade B, Top 20%). Investment profile: Strong Candidate. Sub-scores: Disaster Risk: 13/25, Stability: 16/25, Water Risk: 22/25, Data Density: 24/25.