Jarra West is a 139 km² city in Lower River, The Gambia with a population of 21,223.
The nearest HV substation is on site. The nearest transmission grid line is 215.3 km away.
The nearest fiber route is on site. The nearest IXP is 120.8 km away. The nearest subsea landing station is 109.3 km away.
The city faces Extreme Heat, Wildfire as primary natural hazard risks. Overall hazard score: 2.2/3.
Between 2020–2025, 0 conflict events were recorded (trend: stable). Most recent year (2025): 0 events. Stability score: 3.0/3.
Water stress is rated Low (score 0.0/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 21,223. Data density score: 1.4/3.
Jarra West scores 71/100 overall (Grade B, Top 20%). Investment profile: Strong Candidate. Sub-scores: Disaster Risk: 15/25, Stability: 25/25, Water Risk: 25/25, Data Density: 5/25.