Mumias West is a 138 km² city in Kakamega, Kenya with a population of 110,431.
The nearest HV substation is on site. The nearest transmission grid line is on site.
The nearest fiber route is on site. The nearest IXP is 196.6 km away. The nearest subsea landing station is 425.0 km away.
The city faces River Flood, Wildfire as primary natural hazard risks. Overall hazard score: 2.1/3.
Between 2020–2025, 2 conflict events were recorded (trend: decreasing). Most recent year (2025): 0 events. Stability score: 2.7/3.
Water stress is rated Low (score 0.0/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 110,431. Data density score: 2.5/3.
Mumias West scores 79/100 overall (Grade B, Top 20%). Investment profile: Strong Candidate. Sub-scores: Disaster Risk: 14/25, Stability: 21/25, Water Risk: 25/25, Data Density: 19/25.