Mwingi West is a 1,180 km² city in Kitui, Kenya with a population of 159,810.
The nearest HV substation is on site. The nearest transmission grid line is on site.
The nearest fiber route is on site. The nearest IXP is 110.5 km away. The nearest subsea landing station is 358.2 km away.
The city faces Wildfire as primary natural hazard risks. Extreme Heat are at moderate levels. Overall hazard score: 2.4/3.
Between 2020–2025, 5 conflict events were recorded (trend: stable). Most recent year (2025): 0 events. Stability score: 2.2/3.
Water stress is rated Medium to High (score 2.1/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 159,810. Data density score: 2.7/3.
Mwingi West scores 69/100 overall (Grade B, Top 35%). Investment profile: Strong Candidate. Sub-scores: Disaster Risk: 18/25, Stability: 15/25, Water Risk: 15/25, Data Density: 21/25.