Samburu East is a 10,059 km² city in Samburu, Kenya with a population of 92,061.
The nearest HV substation is 16.8 km away. The nearest transmission grid line is 53.5 km away.
The nearest fiber route is on site. The nearest IXP is 220.6 km away. The nearest subsea landing station is 557.5 km away.
The city faces Wildfire as primary natural hazard risks. Landslide, Extreme Heat are at moderate levels. Overall hazard score: 2.2/3.
Between 2020–2025, 69 conflict events were recorded (trend: increasing). Most recent year (2025): 16 events. Stability score: 1.3/3.
Water stress is rated N/A (score N/A/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 92,061. Data density score: 2.6/3.
Samburu East scores 38/100 overall (Grade D, Below Average). Investment profile: Early-Stage Market. Sub-scores: Disaster Risk: 15/25, Stability: 3/25, Water Risk: 0/25, Data Density: 19/25.