Sabatia is a 112 km² city in Vihiga, Kenya with a population of 139,268.
The nearest HV substation is on site. The nearest transmission grid line is 14.5 km away.
The nearest fiber route is on site. The nearest IXP is 229.8 km away. The nearest subsea landing station is 460.3 km away.
The city faces Wildfire as primary natural hazard risks. Earthquake are at moderate levels. Overall hazard score: 2.1/3.
Between 2020–2025, 1 conflict events were recorded (trend: increasing). Most recent year (2025): 1 events. Stability score: 2.6/3.
Water stress is rated N/A (score N/A/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 139,268. Data density score: 2.6/3.
Sabatia scores 54/100 overall (Grade C, Above Average). Investment profile: Emerging Opportunity. Sub-scores: Disaster Risk: 14/25, Stability: 20/25, Water Risk: 0/25, Data Density: 20/25.