Wajir South is a 21,629 km² city in Wajir, Kenya with a population of 357,704.
The nearest HV substation is on site. The nearest transmission grid line is 97.7 km away.
The nearest fiber route is 5.1 km from the city boundary. The nearest IXP is 382.7 km away. The nearest subsea landing station is 455.8 km away.
The city faces Wildfire as primary natural hazard risks. River Flood, Extreme Heat are at moderate levels. Overall hazard score: 2.2/3.
Between 2020–2025, 47 conflict events were recorded (trend: decreasing). Most recent year (2025): 3 events. Stability score: 1.5/3.
Water stress is rated N/A (score N/A/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 357,704. Data density score: 2.0/3.
Wajir South scores 34/100 overall (Grade F, Below Average). Investment profile: Challenging Environment. Sub-scores: Disaster Risk: 15/25, Stability: 6/25, Water Risk: 0/25, Data Density: 13/25.