Gibeon is a 50,430 km² city in Hardap, Namibia with a population of 15,264.
The nearest HV substation is on site. The nearest transmission grid line is on site.
The nearest fiber route is on site. The nearest IXP is 180.7 km away. The nearest subsea landing station is 104.5 km away.
The city faces Wildfire as primary natural hazard risks. Coastal Flood, Tsunami, Extreme Heat are at moderate levels. Overall hazard score: 2.0/3.
Between 2020–2025, 0 conflict events were recorded (trend: stable). Most recent year (2025): 0 events. Stability score: 3.0/3.
Water stress is rated Extremely High (score 5.0/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 15,264. Data density score: 2.9/3.
Gibeon scores 61/100 overall (Grade C, Top 35%). Investment profile: Emerging Opportunity. Sub-scores: Disaster Risk: 13/25, Stability: 25/25, Water Risk: 0/25, Data Density: 23/25.