Esan Central is a 252 km² city in Edo, Nigeria with a population of 184,882.
The nearest HV substation is on site. The nearest transmission grid line is on site.
The nearest fiber route is on site. The nearest IXP is 214.7 km away. The nearest subsea landing station is 302.4 km away.
The city faces Wildfire as primary natural hazard risks. Extreme Heat are at moderate levels. Overall hazard score: 2.2/3.
Between 2020–2025, 200 conflict events were recorded (trend: increasing). Most recent year (2025): 27 events. Stability score: 1.5/3.
Water stress is rated Low (score 0.0/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 184,882. Data density score: 2.3/3.
Esan Central scores 63/100 overall (Grade C, Top 35%). Investment profile: Emerging Opportunity. Sub-scores: Disaster Risk: 15/25, Stability: 7/25, Water Risk: 25/25, Data Density: 16/25.