Etsako Central is a 660 km² city in Edo, Nigeria with a population of 124,015.
The nearest HV substation is 17.5 km away. The nearest transmission grid line is 6.6 km away.
The nearest fiber route is 11.8 km from the city boundary. The nearest IXP is 223.4 km away. The nearest subsea landing station is 294.5 km away.
The city faces River Flood, Extreme Heat, Wildfire as primary natural hazard risks. Overall hazard score: 2.0/3.
Between 2020–2025, 200 conflict events were recorded (trend: increasing). Most recent year (2025): 27 events. Stability score: 1.5/3.
Water stress is rated Low (score 0.0/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 124,015. Data density score: 1.4/3.
Etsako Central scores 50/100 overall (Grade D, Average). Investment profile: Early-Stage Market. Sub-scores: Disaster Risk: 13/25, Stability: 7/25, Water Risk: 25/25, Data Density: 5/25.