Uhunmwonde is a 2,030 km² city in Edo, Nigeria with a population of 199,715.
The nearest HV substation is on site. The nearest transmission grid line is on site.
The nearest fiber route is on site. The nearest IXP is 195.4 km away. The nearest subsea landing station is 246.7 km away.
The city faces Wildfire as primary natural hazard risks. Extreme Heat are at moderate levels. Overall hazard score: 2.3/3.
Between 2020–2025, 200 conflict events were recorded (trend: increasing). Most recent year (2025): 27 events. Stability score: 1.5/3.
Water stress is rated Low (score 0.0/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 199,715. Data density score: 2.8/3.
Uhunmwonde scores 71/100 overall (Grade B, Top 20%). Investment profile: Strong Candidate. Sub-scores: Disaster Risk: 17/25, Stability: 7/25, Water Risk: 25/25, Data Density: 22/25.