Ntondozi is a 285 km² city in Manzini, Eswatini with a population of 20,860.
The nearest HV substation is on site. The nearest transmission grid line is on site.
The nearest fiber route is on site. The nearest IXP is 159.0 km away. The nearest subsea landing station is 157.0 km away.
The city faces River Flood, Wildfire as primary natural hazard risks. Extreme Heat are at moderate levels. Overall hazard score: 1.8/3.
Between 2020–2025, 12 conflict events were recorded (trend: decreasing). Most recent year (2025): 0 events. Stability score: 1.6/3.
Water stress is rated Low (score 0.1/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 20,860. Data density score: 1.4/3.
Ntondozi scores 47/100 overall (Grade D, Average). Investment profile: Early-Stage Market. Sub-scores: Disaster Risk: 10/25, Stability: 7/25, Water Risk: 24/25, Data Density: 5/25.