Missenyi is a 2,825 km² city in Kagera, Tanzania with a population of 268,690.
The nearest HV substation is on site. The nearest transmission grid line is on site.
The nearest fiber route is on site. The nearest IXP is 131.8 km away. The nearest subsea landing station is 234.5 km away.
The city faces River Flood, Wildfire as primary natural hazard risks. Urban Flood are at moderate levels. Overall hazard score: 2.0/3.
Between 2020–2025, 0 conflict events were recorded (trend: stable). Most recent year (2025): 0 events. Stability score: 3.0/3.
Water stress is rated Low (score 0.0/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 268,690. Data density score: 2.5/3.
Missenyi scores 82/100 overall (Grade A, Top 10%). Investment profile: Prime Investment Target. Sub-scores: Disaster Risk: 13/25, Stability: 25/25, Water Risk: 25/25, Data Density: 18/25.