Uvinza is a 10,054 km² city in Kigoma, Tanzania with a population of 490,984.
The nearest HV substation is 8.6 km away. The nearest transmission grid line is 61.6 km away.
The nearest fiber route is on site. The nearest IXP is 171.7 km away. The nearest subsea landing station is 665.4 km away.
The city faces River Flood, Wildfire as primary natural hazard risks. Earthquake are at moderate levels. Overall hazard score: 2.0/3.
Between 2020–2025, 1 conflict events were recorded (trend: stable). Most recent year (2025): 0 events. Stability score: 2.9/3.
Water stress is rated Low (score 0.0/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 490,984. Data density score: 2.2/3.
Uvinza scores 77/100 overall (Grade B, Top 20%). Investment profile: Strong Candidate. Sub-scores: Disaster Risk: 13/25, Stability: 24/25, Water Risk: 25/25, Data Density: 15/25.