Kilwa is a 14,872 km² city in Lindi, Tanzania with a population of 338,125.
The nearest HV substation is 60.8 km away. The nearest transmission grid line is 130.4 km away.
The nearest fiber route is on site. The nearest IXP is 156.0 km away. The nearest subsea landing station is 105.5 km away.
The city faces Coastal Flood, Wildfire as primary natural hazard risks. River Flood, Earthquake, Extreme Heat are at moderate levels. Overall hazard score: 1.9/3.
Between 2020–2025, 1 conflict events were recorded (trend: stable). Most recent year (2025): 0 events. Stability score: 2.8/3.
Water stress is rated N/A (score N/A/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 338,125. Data density score: 2.2/3.
Kilwa scores 49/100 overall (Grade D, Average). Investment profile: Early-Stage Market. Sub-scores: Disaster Risk: 11/25, Stability: 23/25, Water Risk: 0/25, Data Density: 15/25.