Buzaaya is a 409 km² city in Kamuli, Uganda with a population of 197,770.
The nearest HV substation is 7.0 km away. The nearest transmission grid line is 7.2 km away.
The nearest fiber route is 21.6 km from the city boundary. The nearest IXP is 60.9 km away. The nearest subsea landing station is 261.7 km away.
The city faces Wildfire as primary natural hazard risks. River Flood are at moderate levels. Overall hazard score: 2.2/3.
Between 2020–2025, 0 conflict events were recorded (trend: stable). Most recent year (2025): 0 events. Stability score: 3.0/3.
Water stress is rated Low (score 0.0/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 197,770. Data density score: 2.2/3.
Buzaaya scores 80/100 overall (Grade A, Top 10%). Investment profile: Prime Investment Target. Sub-scores: Disaster Risk: 15/25, Stability: 25/25, Water Risk: 25/25, Data Density: 15/25.