Buwekula is a 2,713 km² city in Mubende, Uganda with a population of 758,032.
The nearest HV substation is on site. The nearest transmission grid line is on site.
The nearest fiber route is on site. The nearest IXP is 111.4 km away. The nearest subsea landing station is 80.9 km away.
The city faces Wildfire as primary natural hazard risks. Earthquake are at moderate levels. Overall hazard score: 2.2/3.
Between 2020–2025, 5 conflict events were recorded (trend: decreasing). Most recent year (2025): 0 events. Stability score: 2.3/3.
Water stress is rated Low (score 0.0/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 758,032. Data density score: 2.6/3.
Buwekula scores 76/100 overall (Grade B, Top 20%). Investment profile: Strong Candidate. Sub-scores: Disaster Risk: 15/25, Stability: 16/25, Water Risk: 25/25, Data Density: 20/25.