eThekwini is a 2,548 km² city in Kwa-Zulu Natal, South Africa with a population of 4,374,661.
The nearest HV substation is on site. The nearest transmission grid line is on site.
The nearest fiber route is on site. An IXP is present on site. A subsea cable landing station is on site.
The city faces Wildfire as primary natural hazard risks. River Flood, Coastal Flood, Tsunami, Extreme Heat are at moderate levels. Overall hazard score: 2.0/3.
Between 2020–2025, 9 conflict events were recorded (trend: decreasing). Most recent year (2025): 0 events. Stability score: 2.8/3.
Water stress is rated Low to Medium (score 1.7/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 4,374,661. Data density score: 2.7/3.
eThekwini scores 72/100 overall (Grade B, Top 20%). Investment profile: Strong Candidate. Sub-scores: Disaster Risk: 12/25, Stability: 23/25, Water Risk: 16/25, Data Density: 21/25.