Shibuyunji is a 1,731 km² city in Central, Zambia with a population of 108,288.
The nearest HV substation is on site. The nearest transmission grid line is on site.
The nearest fiber route is 22.4 km from the city boundary. The nearest IXP is 36.4 km away. The nearest subsea landing station is 913.0 km away.
The city faces River Flood, Wildfire as primary natural hazard risks. Overall hazard score: 2.1/3.
Between 2020–2025, 2 conflict events were recorded (trend: stable). Most recent year (2025): 0 events. Stability score: 2.9/3.
Water stress is rated Low (score 0.1/5 on the WRI Aqueduct scale).
Cell towers (weighted): N/A. Cell towers (raw): N/A. City population: 108,288. Data density score: 2.0/3.
Shibuyunji scores 74/100 overall (Grade B, Top 20%). Investment profile: Strong Candidate. Sub-scores: Disaster Risk: 14/25, Stability: 23/25, Water Risk: 24/25, Data Density: 12/25.